Final manufacturing PMI from Markit
- Highest since March 2015
- Preliminary reading was 53.9
- Prior was 55.0
- Employment 55.8 vs 55.7 - highest since Sept 2014
- Output 55.9 vs 55.7 prior
That's a healthy reading and a bump from the preliminary number.
That's a healthy reading and a bump from the preliminary number.